Drag the sliders to see short-run production and cost curves, then take the quiz.
Q = 10·L^0.6 (diminishing returns, rounded). Defaults: w=$10, FC=$100, P=$20.
| L | Q | MP | AP | TVC | TFC | TC | MC | ATC | AVC | AFC |
|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 0 | 0.0 | 0.00 | 0.00 | 100.00 | 100.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| 1 | 10 | 10.0 | 10.00 | 10.00 | 100.00 | 110.00 | 1.00 | 11.00 | 1.00 | 10.00 |
| 2 | 15 | 5.2 | 7.58 | 20.00 | 100.00 | 120.00 | 1.94 | 7.92 | 1.32 | 6.60 |
| 3 | 19 | 4.2 | 6.44 | 30.00 | 100.00 | 130.00 | 2.40 | 6.72 | 1.55 | 5.17 |
| 4 | 23 | 3.6 | 5.74 | 40.00 | 100.00 | 140.00 | 2.75 | 6.09 | 1.74 | 4.35 |
| 5 | 26 | 3.3 | 5.25 | 50.00 | 100.00 | 150.00 | 3.04 | 5.71 | 1.90 | 3.81 |
| 6 | 29 | 3.0 | 4.88 | 60.00 | 100.00 | 160.00 | 3.29 | 5.46 | 2.05 | 3.41 |
| 7 | 32 | 2.8 | 4.59 | 70.00 | 100.00 | 170.00 | 3.52 | 5.29 | 2.18 | 3.11 |
| 8 | 35 | 2.7 | 4.35 | 80.00 | 100.00 | 180.00 | 3.73 | 5.17 | 2.30 | 2.87 |